<title>Which of the following represent a discretionary dependency?</title>
<link>https://madanswer.com/34182/which-of-the-following-represent-a-discretionary-dependency</link>
<description>Which of the following represent a discretionary dependency?&lt;br /&gt;
&lt;br /&gt;
a Not starting design until all of the approvals have been received.&lt;br /&gt;
&lt;br /&gt;
b Waiting the specified 72 hours before stripping formwork from a newly poured concrete slab.&lt;br /&gt;
&lt;br /&gt;
c Applying a start-to-start link between two tasks in a PDM network.&lt;br /&gt;
&lt;br /&gt;
d Applying a lag of 4 days between two tasks.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34182/which-of-the-following-represent-a-discretionary-dependency</guid>
<pubDate>Thu, 01 Oct 2020 03:01:55 +0000</pubDate>
</item>
<item>
<title>Project management process groups have all of the following characteristics except:</title>
<link>https://madanswer.com/34181/project-management-process-groups-have-all-the-following-characteristics-except</link>
<description>Project management process groups have all of the following characteristics except:&lt;br /&gt;
&lt;br /&gt;
a All of the process groups are needed on all projects and all of their interactions apply to each phase of a project as well as the overall project.&lt;br /&gt;
&lt;br /&gt;
b The process groups are seldom one-time, discrete events; they are overlapping activities that occur throughout the project.&lt;br /&gt;
&lt;br /&gt;
c Where a project is divided into phases, the process groups are invoked as appropriate.&lt;br /&gt;
&lt;br /&gt;
d The process groups are linked by the outputs they produce.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34181/project-management-process-groups-have-all-the-following-characteristics-except</guid>
<pubDate>Thu, 01 Oct 2020 03:01:15 +0000</pubDate>
</item>
<item>
<title>The responsibility assignment matrix (RAM) shows:</title>
<link>https://madanswer.com/34180/the-responsibility-assignment-matrix-ram-shows</link>
<description>The responsibility assignment matrix (RAM) shows:&lt;br /&gt;
&lt;br /&gt;
a The connections between activities and project team members.&lt;br /&gt;
&lt;br /&gt;
b The delegation of responsibility through the hierarchically organised management structure.&lt;br /&gt;
&lt;br /&gt;
c Accountabilities to assist in team performance appraisals.&lt;br /&gt;
&lt;br /&gt;
d The sequence of activities a named resource is responsible for accomplishing.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34180/the-responsibility-assignment-matrix-ram-shows</guid>
<pubDate>Thu, 01 Oct 2020 03:00:01 +0000</pubDate>
</item>
<item>
<title>The cost of quality includes all of the following except:</title>
<link>https://madanswer.com/34179/the-cost-of-quality-includes-all-of-the-following-except</link>
<description>The cost of quality includes all of the following except: &lt;br /&gt;
&lt;br /&gt;
a Buying professional indemnity insurance.&lt;br /&gt;
&lt;br /&gt;
b The cost of defects and rework caused by failing to achieve requirements.&lt;br /&gt;
&lt;br /&gt;
c The cost of inspecting and appraising conforming products produced by the&lt;br /&gt;
&lt;br /&gt;
project.&lt;br /&gt;
&lt;br /&gt;
d Preventing non-conformance to requirements.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34179/the-cost-of-quality-includes-all-of-the-following-except</guid>
<pubDate>Thu, 01 Oct 2020 02:59:14 +0000</pubDate>
</item>
<item>
<title>All of the following statements concerning the project scope statement are true except:</title>
<link>https://madanswer.com/34178/all-the-following-statements-concerning-the-project-scope-statement-are-true-except</link>
<description>All of the following statements concerning the project scope statement are true except:&lt;br /&gt;
&lt;br /&gt;
a It is an output of the Validate Scope process.&lt;br /&gt;
&lt;br /&gt;
b It describes the project’s deliverables and the work needed to create them.&lt;br /&gt;
&lt;br /&gt;
c It may contain explicit scope exclusions that can assist in managing&lt;br /&gt;
&lt;br /&gt;
stakeholder expectations.&lt;br /&gt;
&lt;br /&gt;
d It provides a common understanding of the project’s scope among the&lt;br /&gt;
&lt;br /&gt;
project’s stakeholders.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34178/all-the-following-statements-concerning-the-project-scope-statement-are-true-except</guid>
<pubDate>Thu, 01 Oct 2020 02:58:39 +0000</pubDate>
</item>
<item>
<title>All of the following are true concerning enterprise environmental factors (EEF) except:</title>
<link>https://madanswer.com/34177/all-the-following-are-true-concerning-enterprise-environmental-factors-eef-except</link>
<description>All of the following are true concerning enterprise environmental factors (EEF) except:&lt;br /&gt;
&lt;br /&gt;
a EEF do not include the organisations purchasing guidelines because this type of function is managed by the Accounts Department.&lt;br /&gt;
&lt;br /&gt;
b EEF include the tools, systems and software that comprise the project management information system (PMIS).&lt;br /&gt;
&lt;br /&gt;
c EEF incorporates the organisation’s culture, structure and processes.&lt;br /&gt;
&lt;br /&gt;
d EEF include all relevant laws, regulations and standards imposed by all levels of government, industry bodies and society.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34177/all-the-following-are-true-concerning-enterprise-environmental-factors-eef-except</guid>
<pubDate>Thu, 01 Oct 2020 02:56:58 +0000</pubDate>
</item>
<item>
<title>The project charter has all of the following characteristics except:</title>
<link>https://madanswer.com/34176/the-project-charter-has-all-of-the-following-characteristics-except</link>
<description>The project charter has all of the following characteristics except:&lt;br /&gt;
&lt;br /&gt;
a Its primary use is to authorise the start of a project or phase.&lt;br /&gt;
&lt;br /&gt;
b It provides the project manager with authority to apply resources and&lt;br /&gt;
&lt;br /&gt;
expend money on project activities.&lt;br /&gt;
&lt;br /&gt;
c Its primary use is to request bids or proposals for the work it defines.&lt;br /&gt;
&lt;br /&gt;
d The project charter can be created by the person external to the project, responsible for the authorisation of the work, or that person can delegate the creation of the project charter to the project manager.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34176/the-project-charter-has-all-of-the-following-characteristics-except</guid>
<pubDate>Thu, 01 Oct 2020 02:56:22 +0000</pubDate>
</item>
<item>
<title>All of the following people developed management theories focused on motivation except:</title>
<link>https://madanswer.com/34175/all-the-following-people-developed-management-theories-focused-motivation-except</link>
<description>All of the following people developed management theories focused on motivation except:&lt;br /&gt;
&lt;br /&gt;
a Maslow.&lt;br /&gt;
&lt;br /&gt;
b McGregor.&lt;br /&gt;
&lt;br /&gt;
c Hertzberg.&lt;br /&gt;
&lt;br /&gt;
d Deming.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34175/all-the-following-people-developed-management-theories-focused-motivation-except</guid>
<pubDate>Thu, 01 Oct 2020 02:55:27 +0000</pubDate>
</item>
<item>
<title>As part of a successful communication, the receiver is responsible for:</title>
<link>https://madanswer.com/34174/as-part-of-a-successful-communication-the-receiver-is-responsible-for</link>
<description>As part of a successful communication, the receiver is responsible for:&lt;br /&gt;
&lt;br /&gt;
a Making sure the information is clear and complete, understood and&lt;br /&gt;
&lt;br /&gt;
acknowledged.&lt;br /&gt;
&lt;br /&gt;
b Making sure the information is received in its entirety, understood correctly&lt;br /&gt;
&lt;br /&gt;
and acknowledged appropriately.&lt;br /&gt;
&lt;br /&gt;
c Making sure the information is clear and complete, understood and agreed&lt;br /&gt;
&lt;br /&gt;
with.&lt;br /&gt;
&lt;br /&gt;
d Listening actively to ensure all of the information is received.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34174/as-part-of-a-successful-communication-the-receiver-is-responsible-for</guid>
<pubDate>Thu, 01 Oct 2020 02:54:44 +0000</pubDate>
</item>
<item>
<title>All of the following statements are true about product and project life cycles except:</title>
<link>https://madanswer.com/34173/all-the-following-statements-are-true-about-product-and-project-life-cycles-except</link>
<description>All of the following statements are true about product and project life&lt;br /&gt;
&lt;br /&gt;
cycles except:&lt;br /&gt;
&lt;br /&gt;
a Generally a product lifecycle is contained within a project lifecycle.&lt;br /&gt;
&lt;br /&gt;
b A project life cycle is determined by the organisation and generally consists&lt;br /&gt;
&lt;br /&gt;
of phases that may be sequential or overlapping.&lt;br /&gt;
&lt;br /&gt;
c A product lifecycle is determined by the organisation and generally consists&lt;br /&gt;
&lt;br /&gt;
of sequential phases.&lt;br /&gt;
&lt;br /&gt;
d Generally a project lifecycle is contained within a product lifecycle.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34173/all-the-following-statements-are-true-about-product-and-project-life-cycles-except</guid>
<pubDate>Thu, 01 Oct 2020 02:53:57 +0000</pubDate>
</item>
<item>
<title>The Control Costs process includes all of the following except:</title>
<link>https://madanswer.com/34172/the-control-costs-process-includes-all-of-the-following-except</link>
<description>The Control Costs process includes all of the following except:&lt;br /&gt;
&lt;br /&gt;
a Informing appropriate stakeholders of all approved changes and associated&lt;br /&gt;
&lt;br /&gt;
costs.&lt;br /&gt;
&lt;br /&gt;
b Influencing factors that create changes in the authorised cost baseline.&lt;br /&gt;
&lt;br /&gt;
c Developing the cost performance baseline.&lt;br /&gt;
&lt;br /&gt;
d Acting to bring expected cost overruns within acceptable limits.&lt;br /&gt;
&lt;br /&gt;
Answers Reference: PMBOK® Guide Section 7.4 p259</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34172/the-control-costs-process-includes-all-of-the-following-except</guid>
<pubDate>Thu, 01 Oct 2020 02:52:41 +0000</pubDate>
</item>
<item>
<title>FPIF is an acronym for: Gloss.</title>
<link>https://madanswer.com/34171/fpif-is-an-acronym-for-gloss</link>
<description>FPIF is an acronym for:&lt;br /&gt;
&lt;br /&gt;
a Fixed Price Incentive Fee&lt;br /&gt;
&lt;br /&gt;
b Firm Price Incentive Free&lt;br /&gt;
&lt;br /&gt;
c Fixed Price Indicator Factor&lt;br /&gt;
&lt;br /&gt;
d Fast Performance Incentive Fee</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34171/fpif-is-an-acronym-for-gloss</guid>
<pubDate>Thu, 01 Oct 2020 02:51:55 +0000</pubDate>
</item>
<item>
<title>The component of the Resource Management Plan that describes when and how the project human resource requirements will be acquired is called the:</title>
<link>https://madanswer.com/34170/component-resource-management-describes-project-resource-requirements-acquired</link>
<description>The component of the Resource Management Plan that describes when&lt;br /&gt;
&lt;br /&gt;
and how the project human resource requirements will be acquired is&lt;br /&gt;
&lt;br /&gt;
called the:&lt;br /&gt;
&lt;br /&gt;
a Organisational Breakdown Structure (OBS).&lt;br /&gt;
&lt;br /&gt;
b Human Resource Management Plan.&lt;br /&gt;
&lt;br /&gt;
c Staffing Management Plan.&lt;br /&gt;
&lt;br /&gt;
d Team Management Plan.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34170/component-resource-management-describes-project-resource-requirements-acquired</guid>
<pubDate>Thu, 01 Oct 2020 02:47:58 +0000</pubDate>
</item>
<item>
<title>A binding contract is legally created when: Ch.12</title>
<link>https://madanswer.com/34169/a-binding-contract-is-legally-created-when-ch-12</link>
<description>A binding contract is legally created when: Ch.12&lt;br /&gt;
&lt;br /&gt;
A binding contract is legally created when: Ch.12&lt;br /&gt;
&lt;br /&gt;
a The formal contract documents are signed by your senior management.&lt;br /&gt;
&lt;br /&gt;
b When your legal department advises the contract is acceptable.&lt;br /&gt;
&lt;br /&gt;
c The formal contract documents are signed by official representatives of&lt;br /&gt;
&lt;br /&gt;
both parties.&lt;br /&gt;
&lt;br /&gt;
d There is an offer, acceptance, performance and consideration.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34169/a-binding-contract-is-legally-created-when-ch-12</guid>
<pubDate>Thu, 01 Oct 2020 02:47:09 +0000</pubDate>
</item>
<item>
<title>The risks in the Risk Register are updated as a part of each of the following processes:</title>
<link>https://madanswer.com/34168/the-risks-in-the-risk-register-are-updated-as-part-of-each-of-the-following-processes</link>
<description>The risks in the Risk Register are updated as a part of each of the following&lt;br /&gt;
&lt;br /&gt;
processes:&lt;br /&gt;
&lt;br /&gt;
a Plan Risk Management, Identify Risks, and Perform Qualitative Risk&lt;br /&gt;
&lt;br /&gt;
Analysis.&lt;br /&gt;
&lt;br /&gt;
b Identify Risks, Perform Qualitative Risk Analysis, Perform Quantitative Risk&lt;br /&gt;
&lt;br /&gt;
Analysis and Monitor Risks.&lt;br /&gt;
&lt;br /&gt;
c Perform Qualitative Risk Analysis, Perform Quantitative Risk Analysis, Plan&lt;br /&gt;
&lt;br /&gt;
Risk Responses, Implement Risk Responses and Monitor Risks.&lt;br /&gt;
&lt;br /&gt;
d Plan Risk Management, Identify Risks, Plan Risk Responses, and Monitor&lt;br /&gt;
&lt;br /&gt;
Risks.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/34168/the-risks-in-the-risk-register-are-updated-as-part-of-each-of-the-following-processes</guid>
<pubDate>Thu, 01 Oct 2020 02:46:14 +0000</pubDate>
</item>
<item>
<title>A procurement audit will consider all of the following except:</title>
<link>https://madanswer.com/33633/a-procurement-audit-will-consider-all-of-the-following-except</link>
<description>A procurement audit will consider all of the following except:&lt;br /&gt;
&lt;br /&gt;
a The changes in market conditions between the contract date and the&lt;br /&gt;
&lt;br /&gt;
current time.&lt;br /&gt;
&lt;br /&gt;
b Any successes or failures in the process that warrant recognition.&lt;br /&gt;
&lt;br /&gt;
c The complete procurement process from initial planning through to closure&lt;br /&gt;
&lt;br /&gt;
of the procurement.&lt;br /&gt;
&lt;br /&gt;
d Any lessons learned that can be applied to future procurement processes.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33633/a-procurement-audit-will-consider-all-of-the-following-except</guid>
<pubDate>Mon, 14 Sep 2020 03:30:20 +0000</pubDate>
</item>
<item>
<title>The code of accounts:</title>
<link>https://madanswer.com/33632/the-code-of-accounts</link>
<description>The code of accounts:&lt;br /&gt;
&lt;br /&gt;
a Is the system used to keep track of purchases and contracts.&lt;br /&gt;
&lt;br /&gt;
b Is any numbering system used to uniquely identify each component of the&lt;br /&gt;
&lt;br /&gt;
work breakdown structure.&lt;br /&gt;
&lt;br /&gt;
c Links the work breakdown structure to the schedule task identifier.&lt;br /&gt;
&lt;br /&gt;
d Is the alpha-numeric reference used in the organisations accounts system&lt;br /&gt;
&lt;br /&gt;
to identify cost centres.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33632/the-code-of-accounts</guid>
<pubDate>Mon, 14 Sep 2020 03:29:43 +0000</pubDate>
</item>
<item>
<title>Analogous estimating when applied to a duration is:</title>
<link>https://madanswer.com/33631/analogous-estimating-when-applied-to-a-duration-is</link>
<description>Analogous estimating when applied to a duration is: &lt;br /&gt;
&lt;br /&gt;
a Based on expert judgement and is consequently more accurate than&lt;br /&gt;
&lt;br /&gt;
standard critical path estimating.&lt;br /&gt;
&lt;br /&gt;
b Used when there is a limited amount of detailed information available.&lt;br /&gt;
&lt;br /&gt;
c A calculation based on a three-point estimate using a modified BETA&lt;br /&gt;
&lt;br /&gt;
distribution.&lt;br /&gt;
&lt;br /&gt;
d The same as ‘bottom up’ estimating.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33631/analogous-estimating-when-applied-to-a-duration-is</guid>
<pubDate>Mon, 14 Sep 2020 03:28:18 +0000</pubDate>
</item>
<item>
<title>During a meeting with some of your project&#039;s stakeholders, you are asked to add to the project&#039;s scope of work. The project records contain</title>
<link>https://madanswer.com/33630/during-meeting-projects-stakeholders-asked-projects-scope-project-records-contain</link>
<description>During a meeting with some of your project&amp;#039;s stakeholders, you are asked&lt;br /&gt;
&lt;br /&gt;
to add to the project&amp;#039;s scope of work. The project records contain&lt;br /&gt;
&lt;br /&gt;
correspondence from before the Charter was signed in which the project&lt;br /&gt;
&lt;br /&gt;
sponsor specifically declined the work being requested by these&lt;br /&gt;
&lt;br /&gt;
stakeholders. The BEST thing for you to do is:&lt;br /&gt;
&lt;br /&gt;
Ethics&lt;br /&gt;
&lt;br /&gt;
a Tell the stakeholders the work cannot be added.&lt;br /&gt;
&lt;br /&gt;
b Evaluate the cost and time impacts of adding the work.&lt;br /&gt;
&lt;br /&gt;
c Add the work if it can be accommodated within the existing budget.&lt;br /&gt;
&lt;br /&gt;
d Talk to the sponsor and let her know of the request.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33630/during-meeting-projects-stakeholders-asked-projects-scope-project-records-contain</guid>
<pubDate>Mon, 14 Sep 2020 03:27:29 +0000</pubDate>
</item>
<item>
<title>All of the following are true of cost plus fixed fee (CPFF) contracts, except:</title>
<link>https://madanswer.com/33629/all-of-the-following-are-true-of-cost-plus-fixed-fee-cpff-contracts-except</link>
<description>All of the following are true of cost plus fixed fee (CPFF) contracts, except:&lt;br /&gt;
&lt;br /&gt;
a The seller is reimbursed for all allowable costs incurred performing the&lt;br /&gt;
&lt;br /&gt;
contract work.&lt;br /&gt;
&lt;br /&gt;
b The seller receives a fixed fee calculated as a percentage of the initial&lt;br /&gt;
&lt;br /&gt;
estimated project cost.&lt;br /&gt;
&lt;br /&gt;
c The fee does not change based on the performance of the seller.&lt;br /&gt;
&lt;br /&gt;
d The seller receives a fee calculated as a fixed percentage of the actual&lt;br /&gt;
&lt;br /&gt;
project cost.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33629/all-of-the-following-are-true-of-cost-plus-fixed-fee-cpff-contracts-except</guid>
<pubDate>Mon, 14 Sep 2020 03:26:50 +0000</pubDate>
</item>
<item>
<title>Which of the following is true concerning the work breakdown structure (WBS)?</title>
<link>https://madanswer.com/33628/which-of-the-following-is-true-concerning-the-work-breakdown-structure-wbs</link>
<description>Which of the following is true concerning the work breakdown structure&lt;br /&gt;
&lt;br /&gt;
(WBS)?&lt;br /&gt;
&lt;br /&gt;
a The PMI WBS and PRINCE2 product breakdown structure (PBS) are&lt;br /&gt;
&lt;br /&gt;
effectively the same thing.&lt;br /&gt;
&lt;br /&gt;
b The WBS is the same as the organisational breakdown structure (OBS).&lt;br /&gt;
&lt;br /&gt;
c The WBS is a hierarchical decomposition of the total scope of work to be&lt;br /&gt;
&lt;br /&gt;
carried out by the project team.&lt;br /&gt;
&lt;br /&gt;
d The WBS is the bill of materials (BoM) needed to accomplish the work of&lt;br /&gt;
&lt;br /&gt;
the project.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33628/which-of-the-following-is-true-concerning-the-work-breakdown-structure-wbs</guid>
<pubDate>Mon, 14 Sep 2020 03:26:12 +0000</pubDate>
</item>
<item>
<title>The processes included in project communication management are: Ch.10</title>
<link>https://madanswer.com/33627/the-processes-included-in-project-communication-management-are-ch-10</link>
<description>The processes included in project communication management are: Ch.10&lt;br /&gt;
&lt;br /&gt;
a Collect Requirements, Plan Communications, Distribute Information and&lt;br /&gt;
&lt;br /&gt;
Control Communications.&lt;br /&gt;
&lt;br /&gt;
b Identify Stakeholders, Collect Requirements, Plan Communications,&lt;br /&gt;
&lt;br /&gt;
Distribute Information, Manage Stakeholder Expectations and Report&lt;br /&gt;
&lt;br /&gt;
Performance.&lt;br /&gt;
&lt;br /&gt;
c Plan Communications Management, Manage Communications and Monitor&lt;br /&gt;
&lt;br /&gt;
Communications.&lt;br /&gt;
&lt;br /&gt;
d Collect Requirements, Plan Communications Management, Manage&lt;br /&gt;
&lt;br /&gt;
Communications and Control Communications.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33627/the-processes-included-in-project-communication-management-are-ch-10</guid>
<pubDate>Mon, 14 Sep 2020 03:25:40 +0000</pubDate>
</item>
<item>
<title>Leadership in a project environment should demonstrate all of the following characteristics except:</title>
<link>https://madanswer.com/33626/leadership-project-environment-should-demonstrate-following-characteristics-except</link>
<description>Leadership in a project environment should demonstrate all of the&lt;br /&gt;
&lt;br /&gt;
following characteristics except:&lt;br /&gt;
&lt;br /&gt;
a The focusing the efforts of a group of people on achieving a common&lt;br /&gt;
&lt;br /&gt;
objective.&lt;br /&gt;
&lt;br /&gt;
b High levels of respect and trust.&lt;br /&gt;
&lt;br /&gt;
c The ability to get things done through others.&lt;br /&gt;
&lt;br /&gt;
d A primary focus on external senior managers and other key stakeholders to&lt;br /&gt;
&lt;br /&gt;
ensure the project is a success through managing upwards.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33626/leadership-project-environment-should-demonstrate-following-characteristics-except</guid>
<pubDate>Mon, 14 Sep 2020 03:22:59 +0000</pubDate>
</item>
<item>
<title>When managing a complex, cross functional project; which of the following structures will give the project manager the most authority?</title>
<link>https://madanswer.com/33625/managing-complex-functional-project-following-structures-project-manager-authority</link>
<description>When managing a complex, cross functional project; which of the&lt;br /&gt;
&lt;br /&gt;
following structures will give the project manager the most authority?&lt;br /&gt;
&lt;br /&gt;
a Balanced matrix.&lt;br /&gt;
&lt;br /&gt;
b Strong matrix.&lt;br /&gt;
&lt;br /&gt;
c Functional.&lt;br /&gt;
&lt;br /&gt;
d Weak matrix.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33625/managing-complex-functional-project-following-structures-project-manager-authority</guid>
<pubDate>Mon, 14 Sep 2020 03:21:23 +0000</pubDate>
</item>
<item>
<title>Co-location is one of the techniques used to: Ch.9</title>
<link>https://madanswer.com/33624/co-location-is-one-of-the-techniques-used-to-ch-9</link>
<description>Co-location is one of the techniques used to: Ch.9&lt;br /&gt;
&lt;br /&gt;
a Ensure effective control over the work of the project team.&lt;br /&gt;
&lt;br /&gt;
b Develop the project team.&lt;br /&gt;
&lt;br /&gt;
c Define the organisation structure.&lt;br /&gt;
&lt;br /&gt;
d Acquire the project team.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33624/co-location-is-one-of-the-techniques-used-to-ch-9</guid>
<pubDate>Mon, 14 Sep 2020 03:20:38 +0000</pubDate>
</item>
<item>
<title>All of the following are true concerning expected monetary value (EMV) except:</title>
<link>https://madanswer.com/33623/all-of-the-following-are-true-concerning-expected-monetary-value-emv-except</link>
<description>All of the following are true concerning expected monetary value (EMV)&lt;br /&gt;
&lt;br /&gt;
except:&lt;br /&gt;
&lt;br /&gt;
a Decision tree analysis is more effective using net present values (NPV) in&lt;br /&gt;
&lt;br /&gt;
its calculations rather than EMV.&lt;br /&gt;
&lt;br /&gt;
b The EMV of an opportunity is generally a positive value.&lt;br /&gt;
&lt;br /&gt;
c EMV is a statistical concept that calculates the average value of a future&lt;br /&gt;
&lt;br /&gt;
scenario that may, or may not happen by multiplying the value of each&lt;br /&gt;
&lt;br /&gt;
possible outcome by the probability of it occurring and summing the&lt;br /&gt;
&lt;br /&gt;
products.&lt;br /&gt;
&lt;br /&gt;
d The EMV of a threat is generally a negative value.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33623/all-of-the-following-are-true-concerning-expected-monetary-value-emv-except</guid>
<pubDate>Mon, 14 Sep 2020 03:19:52 +0000</pubDate>
</item>
<item>
<title>Integrated Change Control includes all of the following tools and techniques except:</title>
<link>https://madanswer.com/33622/integrated-change-control-includes-all-the-following-tools-and-techniques-except</link>
<description>Integrated Change Control includes all of the following tools and&lt;br /&gt;
&lt;br /&gt;
techniques except:&lt;br /&gt;
&lt;br /&gt;
a Project management plan updates.&lt;br /&gt;
&lt;br /&gt;
b Expert judgement.&lt;br /&gt;
&lt;br /&gt;
c Meetings.&lt;br /&gt;
&lt;br /&gt;
d A change control board to approve or reject changes.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33622/integrated-change-control-includes-all-the-following-tools-and-techniques-except</guid>
<pubDate>Mon, 14 Sep 2020 03:19:10 +0000</pubDate>
</item>
<item>
<title>A Pareto diagram shows: Ch.8</title>
<link>https://madanswer.com/33621/a-pareto-diagram-shows-ch-8</link>
<description>A Pareto diagram shows: Ch.8&lt;br /&gt;
&lt;br /&gt;
a The 80% of the work that is important.&lt;br /&gt;
&lt;br /&gt;
b The qualitative improvement trend demonstrated by implementing a Six&lt;br /&gt;
&lt;br /&gt;
Sigma initiative.&lt;br /&gt;
&lt;br /&gt;
c A histogram ordered by frequency of occurrence.&lt;br /&gt;
&lt;br /&gt;
d The 20% of the work that is causing the most issue</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33621/a-pareto-diagram-shows-ch-8</guid>
<pubDate>Mon, 14 Sep 2020 03:18:35 +0000</pubDate>
</item>
<item>
<title>Which calculation is correct for the To-Complete Performance Index (TCPI) based on the Estimate At Completion (EAC)?</title>
<link>https://madanswer.com/33620/which-calculation-correct-complete-performance-index-based-estimate-completion</link>
<description>Which calculation is correct for the To-Complete Performance Index (TCPI)&lt;br /&gt;
&lt;br /&gt;
based on the Estimate At Completion (EAC)?&lt;br /&gt;
&lt;br /&gt;
a AC + (BAC – EV)&lt;br /&gt;
&lt;br /&gt;
b (BAC - EV)/(BAC - AC)&lt;br /&gt;
&lt;br /&gt;
c BAC/CPIcum&lt;br /&gt;
&lt;br /&gt;
d (BAC - EV)/(EAC - AC)</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33620/which-calculation-correct-complete-performance-index-based-estimate-completion</guid>
<pubDate>Mon, 14 Sep 2020 03:17:48 +0000</pubDate>
</item>
<item>
<title>All of the following tools and techniques are part of processes in the Executing process group except:</title>
<link>https://madanswer.com/33619/all-the-following-tools-techniques-part-processes-executing-process-group-except</link>
<description>All of the following tools and techniques are part of processes in the&lt;br /&gt;
&lt;br /&gt;
Executing process group except:&lt;br /&gt;
&lt;br /&gt;
a Performing activities in accordance with the project management plan.&lt;br /&gt;
&lt;br /&gt;
b Managing changes to the deliverables.&lt;br /&gt;
&lt;br /&gt;
c Completing the work in accordance with the defined quality framework and&lt;br /&gt;
&lt;br /&gt;
specification.&lt;br /&gt;
&lt;br /&gt;
d Coordinating people and resources.</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33619/all-the-following-tools-techniques-part-processes-executing-process-group-except</guid>
<pubDate>Mon, 14 Sep 2020 03:15:40 +0000</pubDate>
</item>
<item>
<title>Which conflict resolution technique is most effective?</title>
<link>https://madanswer.com/33471/which-conflict-resolution-technique-is-most-effective</link>
<description>Which conflict resolution technique is most effective?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33471/which-conflict-resolution-technique-is-most-effective</guid>
<pubDate>Wed, 09 Sep 2020 02:57:47 +0000</pubDate>
</item>
<item>
<title>How would you BEST describe this project?</title>
<link>https://madanswer.com/33470/how-would-you-best-describe-this-project</link>
<description>How would you BEST describe this project?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33470/how-would-you-best-describe-this-project</guid>
<pubDate>Wed, 09 Sep 2020 02:57:12 +0000</pubDate>
</item>
<item>
<title>Your sponsor asks you to forecast how much money you expect to spend on the remainder of the project. Which is the BEST estimate to use for this forecast?</title>
<link>https://madanswer.com/33469/your-sponsor-forecast-money-expect-spend-remainder-project-which-estimate-forecast</link>
<description>
&lt;p&gt;Your sponsor asks you to forecast how much money you expect to spend on the remainder of the project. Which is the BEST estimate to use for this forecast?&lt;/p&gt;&lt;div&gt;&lt;/div&gt;
</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33469/your-sponsor-forecast-money-expect-spend-remainder-project-which-estimate-forecast</guid>
<pubDate>Wed, 09 Sep 2020 02:56:50 +0000</pubDate>
</item>
<item>
<title>Can you please explain what is Halo Effect?</title>
<link>https://madanswer.com/33468/can-you-please-explain-what-is-halo-effect</link>
<description>Can you please explain what is Halo Effect?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33468/can-you-please-explain-what-is-halo-effect</guid>
<pubDate>Wed, 09 Sep 2020 02:56:23 +0000</pubDate>
</item>
<item>
<title>In any project, Can you please explain what is the most likely causes of conflict?</title>
<link>https://madanswer.com/33467/in-any-project-can-you-please-explain-what-is-the-most-likely-causes-of-conflict</link>
<description>In any project, Can you please explain what is the most likely causes of conflict?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33467/in-any-project-can-you-please-explain-what-is-the-most-likely-causes-of-conflict</guid>
<pubDate>Wed, 09 Sep 2020 02:55:58 +0000</pubDate>
</item>
<item>
<title>Can you please explain what is an appropriate way to use the knowledge you gathered on the project management?</title>
<link>https://madanswer.com/33466/can-you-please-explain-what-appropriate-way-knowledge-gathered-project-management</link>
<description>Can you please explain what is an appropriate way to use the knowledge you gathered on the project management?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33466/can-you-please-explain-what-appropriate-way-knowledge-gathered-project-management</guid>
<pubDate>Wed, 09 Sep 2020 02:55:28 +0000</pubDate>
</item>
<item>
<title>Can you please explain what is the difference manage quality and control quality?</title>
<link>https://madanswer.com/33465/can-you-please-explain-what-is-the-difference-manage-quality-and-control-quality</link>
<description>Can you please explain what is the difference manage quality and control quality?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33465/can-you-please-explain-what-is-the-difference-manage-quality-and-control-quality</guid>
<pubDate>Wed, 09 Sep 2020 02:54:53 +0000</pubDate>
</item>
<item>
<title>Can you please explain what is respect as per PMI code of conduct?</title>
<link>https://madanswer.com/33464/can-you-please-explain-what-is-respect-as-per-pmi-code-of-conduct</link>
<description>Can you please explain what is respect as per PMI code of conduct?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33464/can-you-please-explain-what-is-respect-as-per-pmi-code-of-conduct</guid>
<pubDate>Wed, 09 Sep 2020 02:54:21 +0000</pubDate>
</item>
<item>
<title>Can you please explain what is the difference between Quality and Grade?</title>
<link>https://madanswer.com/33463/can-you-please-explain-what-is-the-difference-between-quality-and-grade</link>
<description>Can you please explain what is the difference between Quality and Grade?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33463/can-you-please-explain-what-is-the-difference-between-quality-and-grade</guid>
<pubDate>Wed, 09 Sep 2020 02:53:24 +0000</pubDate>
</item>
<item>
<title>Whom do you call as risk owner?</title>
<link>https://madanswer.com/33462/whom-do-you-call-as-risk-owner</link>
<description>Whom do you call as risk owner?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33462/whom-do-you-call-as-risk-owner</guid>
<pubDate>Wed, 09 Sep 2020 02:52:34 +0000</pubDate>
</item>
<item>
<title>What are the different reserve types and explain it?</title>
<link>https://madanswer.com/33461/what-are-the-different-reserve-types-and-explain-it</link>
<description>What are the different reserve types and explain it?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33461/what-are-the-different-reserve-types-and-explain-it</guid>
<pubDate>Wed, 09 Sep 2020 02:52:10 +0000</pubDate>
</item>
<item>
<title>Decomposition is the tool used predominantly for which process?</title>
<link>https://madanswer.com/33460/decomposition-is-the-tool-used-predominantly-for-which-process</link>
<description>Decomposition is the tool used predominantly for which process?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33460/decomposition-is-the-tool-used-predominantly-for-which-process</guid>
<pubDate>Wed, 09 Sep 2020 02:51:34 +0000</pubDate>
</item>
<item>
<title>What is risk and issue?</title>
<link>https://madanswer.com/33459/what-is-risk-and-issue</link>
<description>What is risk and issue?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33459/what-is-risk-and-issue</guid>
<pubDate>Wed, 09 Sep 2020 02:50:37 +0000</pubDate>
</item>
<item>
<title>What is Pareto chart and explain?</title>
<link>https://madanswer.com/33458/what-is-pareto-chart-and-explain</link>
<description>What is Pareto chart and explain?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33458/what-is-pareto-chart-and-explain</guid>
<pubDate>Wed, 09 Sep 2020 02:49:44 +0000</pubDate>
</item>
<item>
<title>What is triple constraint?</title>
<link>https://madanswer.com/33457/what-is-triple-constraint</link>
<description>What is triple constraint?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33457/what-is-triple-constraint</guid>
<pubDate>Wed, 09 Sep 2020 02:49:07 +0000</pubDate>
</item>
<item>
<title>What should be the guiding principle for your project have to be compliant to the processes described?</title>
<link>https://madanswer.com/33456/what-should-the-guiding-principle-your-project-have-compliant-processes-described</link>
<description>What should be the guiding principle for your project have to be compliant to the processes described?</description>
<category>PMP</category>
<guid isPermaLink="true">https://madanswer.com/33456/what-should-the-guiding-principle-your-project-have-compliant-processes-described</guid>
<pubDate>Wed, 09 Sep 2020 02:48:38 +0000</pubDate>
</item>
</channel>
</rss>